Modern methods of construction

FAB house: modular terraced housing, completed 2018

FAB house: modular terraced housing, completed 2018

TDO’s history with MMC

The process, opportunities and constraints, especially with volumetric modular, are different to traditional construction. We see this as an envelope to design within. Similar to designing in an overlooked site,

an envelope to design within possibilities

Collaboration

Started with Bold Tendencies, FAB house, then Dove Lane, Skyroom collaboration, Low Line arches

Better than, rather than as good as.

The Architects’ Journal identified ‘the possibilities of offsite and modern methods of construction (MMC) are at the heart of TDO’s sustainability-driven plans for the years ahead.’

Dove Lane: exemplar modular housing, detailed planning consent granted 2018

Dove Lane: exemplar modular housing, detailed planning consent granted 2018

Low Line arches: pre-fabricated workspaces for micro and SMEs otherwise priced out of the borough, completing 2021

Low Line arches: pre-fabricated workspaces for micro and SMEs otherwise priced out of the borough, completing 2021

Skyroom, St James Road: Key-worker panelised airspace housing, planning consent granted 2020

Skyroom, St James Road: Key-worker panelised airspace housing, planning consent granted 2020

FAB house interiors: working with the manufacturer’s process to celebrate the potential of modular, completed 2018

FAB house interiors: working with the manufacturer’s process to celebrate the potential of modular, completed 2018